Public Prep Charter Schools – Girls Prep II
Girls Prep II is a new Pre-K through 3rd grade facility opening in the fall of 2024. The 6 story building expands Public Prep’s footprint to serve girls in the South Bronx. The building’s flexible design and program will allow it to evolve in forthcoming years, adding new grades up to 8th grade level.
Agency
Practice Area
Client
Public Prep
Industry
Project Vision
Via Collective’s signage and environmental graphics expressed the palette of color, typography, and pattern established in the recently-implemented brand guidelines across a series of navigable and memorable interventions. Mosaic patterns of the Public Prep brand fill immersive wall graphics that punctuate key circulation moments. These patterns and identification signage extend the voice and color of the Public Prep brand throughout the space, yet is uniquely expressed through the volumetric and colorful environment designed by Michael Graves Architect. The signage finish palette merges the Girls Prep II brand with the warm maple wood of the interior furnishings to create a seamlessly-integrated system that is both surprising and clear.
The Public Prep “Mission Wall”, constructed of modulated blocks of text and image, greets visitors in the lobby.
Brett Beyer
A palette of Public Prep purple and wood is expressed across varied applications of the wayfinding.
Brett Beyer
Public Prep values speak through environmental graphics across the building.
Brett Beyer
Large wood floor identification numbers announce arrival at the top of each stair landing.
Brett Beyer
Environmental graphics form a mosaic pattern through wall murals and sign modules.
Brett Beyer
Room identification signage includes portraits of inspiring female figures associated with each classroom.
Brett Beyer
Dimensional letters and environmental graphics form a frieze around the cafetorium.
Brett Beyer
Project Details
Design Team
Katie Osborn (strategy)
Nick Stableski (project management)
Jesse Kidwell (designer)
Brandon Cannon (designer)
Gus Whitaker (designer)
James Tupling (designer)
Collaborators
Michael Graves Architecture & Design (architecture)
L&M Architectural Signs (physical fabrication)
Duggal Visual Solutions (digital fabrication)
About the Work (project management)
Photo Credits
Brett Beyer
Open Date
September 2024