American Veterans Disabled for Life Memorial
Project Vision
The American Veterans Disabled for Life Memorial is the first national memorial dedicated to the 3.5 million veterans living with permanent disabilities. As described by President Obama at the October 2014 dedication ceremony, “From this day forward, Americans will come to this place and ponder the immense sacrifice made on their behalf; the heavy burden borne by a few so that we might live in freedom and peace.”
The memorial Is located on a two-acre site adjacent to the National Mall, in full view of the United States Capitol. Forty-eight individual panels, made of five layers of ¾-inch Starphire glass, comprise three separate walls. The glass walls capture the voices of disabled veterans—personal stories of courage and extraordinary sacrifices made in the service of their country.
The project team gathered more than 700 veterans’ accounts, letters, quotations, and images spanning the full continuum of American military conflicts and organized them into four journey experiences: Pride of Serving, Trauma of Injury, Challenge of Healing, and Discovery of New Purpose. Panels were extensively tested and reviewed by the United States Commission of Fine Arts, the National Capital Planning Commission, and the National Park Service.
The montages are brought to life by changing day and evening light illuminating the bronze silhouettes and passing through the translucent glass to powerful effect. The threading of veterans’ voices and images, constantly shifting and further animated by reflections and shadows of visitors, captures a sense of loss and hope, struggle and strength. The integration of message, image, form, and movement creates a memorable experience for the visitor and serves as a powerful metaphor for the trials and triumphs of our disabled veterans.
Project Details
Design Team
Michael Vergason Landscape Architects: Michael Vergason (principal in charge), Doug Hayes (senior associate), Beata Corcoran (project coordinator)Cloud Gehshan Associates: Jerome Cloud (principal in charge); Ian Goldberg (senior designer); Lily Chong, Matt Cavalier, Leslie Bowman, Sophie Xu, Steve Ricci, Kate Otte (designers)Larry Kirkland Studios: Larry Kirkland
Design Firm
Cloud Gehshan Associates
Project Area
66,910,000 sq ft
Project Budget
$86,000,000
Consultants
Collaborators: Larry Kirkland Studios (bronze sculptures), Claude R. Engle (lighting consultant), History Associates Inc. (historic consultant, quotations), The John Stevens Shop (stone inscriptions), Fluidity Design Consultants (reflecting pool), Technifex (ceremonial flame)Architecture & Engineering Team: Shalom Baranes Associates (architect), Eckersley O’Callaghan (structural engineer), Rummel Klepper & Kahl (site engineering), WSP USA (MEP)
Fabricators
Walla Walla Foundry (bronze sculptures), Savoy Studios (glass fabrication management), Hartung Glass Industries (glass panel cutting, tempering), Moon Shadow Glass (glass panel etching), Glass Strategies (glass panel lamination)